VANCOUVER, Sept. 4 - Mawson Resources Limited ("Mawson") TSX - MAW; Frankfurt - MRY. Mr. Michael Hudson, President & CEO, announces the drill results from the final 32 drill holes from the Company's 40-hole recent diamond drill program at the Tasjo uranium - rare earth element (REE) - phosphate project in Sweden. Twenty-nine of the 40 holes drilled during the program intersected the uranium horizon.
Uranium mineralization was targeted from the surface to approximately 40 metres vertical depth. The drill holes reported in this release tested the Bodkullarna (drill holes BODDD08001 to BODDD08019), Bodkullarna East (BODDD08020 to BODDD08030) and Onbacken (ONBDD08001 to ONBDD08011) prospects which are separated by a strike length of 16 kilometres. These areas are located 8.5 kilometres, 5.5 kilometres and 7.5 kilometres from the Kronotorpet project which was drill tested by the Company in mid 2007. Geophysical mapping by Mawson has demonstrated that all three drilled prospects lie upon a single strike continuous horizon that extends between the prospects. Mineralization was drill tested at Bodkullarna over a 1300 by 160 metre area, at Bodkullarna East over a 1200 by 160 metre area and at Onbdcken over a 400 by 160 metre area.
Better results from the drill holes are included below with a full list of results presented in the attached table 1.
HOLE_ID From To Width U3O8 (metres) (metres) (metres) (ppm) BODDD08027 5 11.3 6.3 208 BODDD08023 6.6 10.6 4 250 BODDD08029 18 24.6 6.6 232 BODDD08008 33.2 37.2 4 264 ONBDD08007 15.4 19.6 4.2 219
Tasjo is a sedimentary uranium deposit where uranium mineralization is associated with concretions of carbonate-fluorapatite, which constitute up to 20% of the rock. Mass balance calculations indicate that the uranium grade of the apatite is 0.16%.
Mr. Hudson states, "Near surface uranium mineralization at Tasjo has now been drill tested within four project areas separated by 16 kilometres. The strike rate of intersecting the mineralized horizon was good with 29 of the 40 drill holes drilled during the 2008 drill program." The qualified person for the Tasjo project, Mark Saxon, director and vice-president of exploration for Mawson, and a member of the Australasian Institute of Mining and Metallurgy, has reviewed and verified the contents of this release. Uranium was analyzed by the ME-MS81 technique by ALS Chemex Ltd.'s laboratories in Pitea, Sweden, and Vancouver, Canada, where duplicates, repeats, blanks and known standards were inserted according to standard industry practice. It is interpreted that reported drill hole intercepts approximate the true width of mineralization.
About the Company: Mawson Resources holds significant uranium resources in the nuclear energy reliant countries of Spain, Sweden and Finland. As the European Union reduces its reliance on carbon-based energy sources, Mawson is well placed as the Company develops its exploration portfolio towards the sustainable production of uranium in the shortest possible time frame.
On behalf of the Board,
"Michael Hudson"
-------------------------------
Michael Hudson, President & CEO
Forward Looking Statement. The statements herein that are not historical facts are forward-looking statements. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed under the heading "Risk Factors" in the company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement. The TSX Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Table 1: Drill hole results from the Tasjo project using a lower cut-off of 100ppm uranium. Results from the first eight holes (BODDD08001 to BODDD08004, BODDD08007, BODDD08013 and ONBDD08001 to ONBDD08002) were released on 26 May 2008. HOLE ID FROM TO WIDTH (m) U308 ppm HOST UNIT BODDD08001 27.60 29.60 2 324 LYCO BODDD08001 32.00 38.00 6 132 ALUM BODDD08002 15.80 16.80 1 168 LYCO BODDD08003 38.90 42.70 3.8 302 LYCO BODDD08003 47.25 49.25 2 132 ALUM BODDD08003 58.25 61.25 3 136 ALUM BODDD08004 19.20 20.05 0.85 214 LYCO BODDD08004 21.75 22.10 0.35 146 LYCO BODDD08005 Hole abandoned BODDD08006 40.00 43.00 3 117.9 ALUM BODDD08007 27.90 28.90 1 421 LYCO BODDD08007 43.20 45.20 2 363 LYCO BODDD08008 33.20 37.20 4 264 LYCO BODDD08009 31.30 32.30 1 206 LYCO BODDD08010 Host not intersected BODDD08011 27.30 28.30 1 137 LYCO BODDD08012 27.50 28.50 1 246 LYCO BODDD08013 11.90 13.60 4.7 136 LYCO BODDD08013 21.90 22.90 1 232 LYCO BODDD08013 26.20 32.20 6 118 ALUM BODDD08014 27.50 28.70 1.2 192 LYCO BODDD08015 8.70 11.70 3 177 ALUM BODDD08015 34.85 35.25 0.4 225 LYCO BODDD08016 18.70 20.40 1.7 257 Lyco BODDD08016 20.40 21.40 1 141 ALUM BODDD08016 23.40 26.40 3 122 ALUM BODDD08016 41.100 41.70 0.6 217 LYCO BODDD08016 42.60 43.60 1 196 LYCO BODDD08016 44.90 45.90 1 121 ALUM BODDD08017 33.30 34.30 1 169 ALUM BODDD08017 36.30 37.30 1 154 ALUM BODDD08018 Host not intersected BODDD08019 10.70 12.70 2 206 LYCO BODDD08019 13.75 15.60 1.85 197 LYCO BODDD08020 3.70 4.70 1 233 LYCO BODDD08020 18.0 21.30 3.3 245 LYCO BODDD08021 43.90 46.50 2.6 229 LYCO BODDD08022 Host not intersected BODDD08023 6.60 10.60 4 250 LYCO BODDD08023 11.90 14.90 3 126 ALUM BODDD08024 20.90 22.90 2 243 LYCO BODDD08025 3.6 6.60 3 244 LYCO BODDD08025 8.95 9.95 1 126 ALUM BODDD08026 4.20 7.20 3 137 ALUM BODDD08026 23.20 26.20 3 173 ALUM BODDD08026 33.80 36.00 2.2 249 LYCO BODDD08027 5.00 11.30 6.3 208 LYCO BODDD08027 19.30 21.30 2 156 ALUM BODDD08027 38.30 40.30 2 172 ALUM BODDD08028 6.50 7.00 0.5 368 LYCO BODDD08028 13.00 15.00 2 167 ALUM BODDD08029 6.40 7.30 0.9 271 LYCO BODDD08029 11.30 14.30 3 159 ALUM BODDD08029 18.00 24.60 6.6 232 LYCO BODDD08029 25.60 27.60 2 164 ALUM BODDD08029 30.60 31.40 0.8 120 ALUM BODDD08030 15.50 17.20 1.7 264 LYCO BODDD08030 18.20 19.20 1 148 ALUM BODDD08030 23.20 26.20 3 161 ALUM BODDD08030 35.50 36.10 0.6 281 LYCO BODDD08030 42.60 44.20 1.6 286 LYCO ONBDD08001 19.90 22.50 2.6 371 LYCO ONBDD08001 22.50 25.50 3 140 ALUM ONBDD08002 19.80 35.80 16 209 LYCO ONBDD08003 48.80 50.80 2 198 LYCO ONBDD08004 Host not intersected ONBDD08005 12.25 17.25 5 248 ALUM ONBDD08005 19.30 20.30 1 123 LYCO ONBDD08006 Host not intersected ONBDD08007 15.40 19.60 4.2 219 LYCO ONBDD08008 Host not intersected ONBDD08009 Host not intersected ONBDD08010 Host not intersected ONBDD08011 Host not intersected
For further information:
Investor Information www.mawsonresources.com
1305 - 1090 West Georgia St., Vancouver, BC, V6E 3V7
Company Contact: Mariana Bermudez (604) 685 9316
Investor Relation Consultants - Mining Interactive
Nick Nicolaas (604) 657 4058, Wayne Melvin (604) 619 6327
Email: info@mawsonresources.com