News

Vancouver, Canada — Mawson Resources Limited (“Mawson”) or (the “Company”) (TSX:MAW) (Frankfurt:MXR) (PINKSHEETS: MWSNF) announces highly encouraging gold and cobalt assay results from 14 diamond holes drilled at the Raja prospect during the 2019 winter program at the Company’s 100% owned Rajapalot Project in northern Finland.

The drill program focused on expanding and defining gold-cobalt resources at Raja, Palokas and South Palokas and testing less drilled prospect areas outside resource areas including the Hut, Terry’s Hammer and Rumajärvi (Figure 1). Only results from the Raja prospect are provided here, with additional results to be reported on a prospect-by-prospect basis. Twenty-eight holes with full assays remain to be reported over the coming months.

A total of 44 holes (PAL0159–PAL0201D1) for 15,059 metres (two short holes abandoned, one wedged hole) have been completed during the winter season. The winter program was executed as proposed (see Mawson News Release 21 Jan 2019), with the planned drill metres achieved safely and without incident.


Highlights from the Raja Prospect:
  • Drill hole PAL0188 intersected 31.3 metres @ 6.0 g/t gold equivalent (“AuEq”), 4.3 g/t gold (“Au”) and 1,030 ppm cobalt (“Co”) from 298.6 metres (no lower cut) (Figure 1 and 2):
    • Including 9.0 metres @ 11.7 g/t AuEq, 9.4 g/t Au and 1,412ppm Co from 320.55 metres (0.5g/t lower cut over 2 metres, Tables 1-3);
    • The hole was targeted to hit high grade mineralization in a 120 metre length gap within the resource reported in December 2018;
  • Drill hole PAL0163 intersected 2.9 metres @ 6,604 ppm Co (Figures 1 and 2) from 416.6 metres. This is the highest-grade cobalt intersection without gold drilled to date including 1 metre @ 1.0% Co from 417.6m, indicating high-grade cobalt mineralization can form peripheral to high grade Au-Co mineralization;
    • The hole was drilled 80 metres across strike from higher grade gold previously intersected in PAL0159;
  • Drill hole PAL0161, previously reported for gold-only, intersected 5.0 metres @ 3.3 g/t AuEq, 2.3 g/t Au and 600 ppm Co from 344 metres representing a 42% increase on earlier result of 4.0 metres @ 2.9 g/t gold from 345 metres;
  • Drill hole PAL0159, previously reported for gold-only, intersected 19.0 metres @ 1.3 g/t AuEq, 0.5 g/t Au and 533 ppm Co from 418 metres (Figures 1 and 2) representing a 258 % increase on earlier result of 3.0 metres @ 2.3 g/t gold from 434 metres;
    • Including 4.0 metres @ 2.6 g/t AuEq, 0.3 g/t Au and 1,419 ppm Co from 422 metres, and 3.0 metres @ 3.4 g/t AuEq, 2.3 g/t Au and 672 ppm Co from 434 metres
  • Mawson’s permit enforcement has been resolved, allowing Mawson to drill from 200 drill platforms (from 529 optional sites) plus 76 existing drill platforms within the 1,462-hectare Kairamaat 2-3 exploration permit area next drill season;

Mr. Hudson, Chairman and CEO, states, "The great drill result from Raja of 31.3 metres @ 6.0 g/t AuEq, demonstrates a linear control on the highest-grade parts of the Raja system, which will allow more accurate down plunge drill targeting beyond the extent of current high-grade gold-cobalt resources. We achieved the aims of our winter drill program by exceeding 15 kilometres in 44 holes. Assays from 28 drill holes remained to be reported, with visible gold noted in 4 of these holes. Importantly, the resolution of our drill permit allows us to plan well in advance for the next drill campaigns. Mawson continues to work closely with all Finnish mining and environmental authorities, as well as all local stakeholders, to ensure our work programs are implemented in a safe, efficient and environmentally friendly way as we drill to grow our gold-cobalt maiden resource.”

Results from 14 holes are reported here, with 10 holes reported with gold and cobalt assays (PAL0160, 164, 166, 169, 171, 172, 176, 188), one hole for gold assays only (PAL0189) and 4 holes for cobalt assays only (PAL0159, 161, 162 163, 165) (Tables 1-3). Only results from the Raja prospect are provided, with additional results to be reported on a prospect-by-prospect basis. Sulphidic (pyrrhotite-rich) intersections and visible gold provide encouraging signs in drill holes PAL0190, 191, 194 and 198 where assays are yet to be received. No significant assays were recorded in drill holes PAL0160 or PAL0165.

The 2019 drill program has revealed that gold-cobalt mineralization at Rajapalot is controlled by linear and upright fault systems within the complexly deformed and hydrothermally altered Paleoproterozoic metamorphic rocks. At Raja, drill hole PAL0188 intersected the mid-point between 120 metre spaced sections including PAL0093 (33.6 metres @ 9.7 g/t AuEq, 8.0 g/t gold, 823 ppm cobalt from 243.0 metres) and PAL0118 (20.7 metres @ 5.6 g/t AuEq, 3.6 g/t Au, 956 ppm Co from 365.2 metres) within the resource reported in December 2018. This hole establishes the linear control on the highest-grade parts of the Raja system, and allowed more accurate drill targeting down plunge external to the resource. The results of these down-plunge drill holes on the linear trend are pending, with some including visible gold (Table 1). PAL0188 intersected 31.3 metres @ 6.0 g/t gold equivalent (“AuEq”), 4.3 g/t gold (“Au”) and 1,030 ppm cobalt (“Co”) from 298.6 metres (no lower cut), including 17.4 metres @ 4.8 g/t AuEq, 2.9g/t Au and 1,113ppm Co from 298.3 metres and 9.0 metres @ 11.7 g/t AuEq, 9.4 g/t Au and 1,412ppm Co from 298.3 metres (Tables 1-3).

Drill hole PAL0164 was located 120 metres down plunge of the last drill section included in the resource and intersected 8.3 metres @ 1.3 g/t AuEq, 0.4 g/t Au and 519 ppm Co from 406.0 metres. The mineralized intersection in PAL0164 is inferred to be approximately 75 metres to the southwest of the linear high-grade gold trend intersected in PAL0188, and the last drill hole in this program, PAL0201D1, has been planned to target the high-grade trend on this section.

Drill hole PAL0159 intersected 18.0 metres @ 1.4 g/t AuEq, 0.5 g/t Au and 547 ppm Co from 419 metres (Figures 1-2), and 4.5 metres @ 3.2 g/t AuEq, 1.9 g/t Au and 754 ppm Co from 451 metres. This includes 4.0 metres @ 2.6 g/t AuEq, 0.3 g/t Au and 1,419 ppm Co from 422 metres, 3.0 metres @ 3.4 g/t AuEq, 2.3 g/t Au and 672 ppm Co from 434 metres and is a 142% increase on the earlier gold-only reported result of 3.0 metres @ 2.3 g/t gold from 434 metres (See release March 04, 2019). PAL0159 is 55 metres northeast of PAL0164 reported above in the same drill section.

The western limits of the mineralization in the drill section including holes PAL0159 and PAL0164 discussed above include the highest-grade cobalt intersection without gold drilled to date. PAL0163 included 1 metre @ 1.0% Co from 417.6 m, within an intersection of 2.9 metres @ 6,604 ppm Co from 416.6 metres. This indicates high-grade cobalt mineralization can also form peripheral to high grade Au-Co mineralization. This is 90 metres in the section from gold-cobalt mineralization intersected in PAL0159.

Drill hole PAL0176 intersected 11.4 metres @ 1.4 g/t AuEq, 0.8g/t Au and 382 ppm Co from 20.5 metres and 3.0 metres @ 4.0 g/t AuEq, 3.8g/t Au and 86 ppm Co from 49 metres. This hole was designed as a near-surface test of the uppermost mineralized horizon of the Raja resource.

Drill hole PAL0161 intersected 5.0 metres @ 3.3 g/t AuEq, 2.3 g/t Au and 600 ppm Co from 344 metres, a 42% increase in AuEq on earlier gold-only result of 4.0 metres @ 2.9 g/t gold from 345 metres. This hole was completed on the eastern limit drilled to date of the drill section including PAL0118 (See release April 10, 2018; 20.7 metres @ 5.6 g/t AuEq, 3.6 g/t Au, 956 ppm Co from 365.2 metres).

PAL0162, PAL0169 and PAL0172 were targeted to hit surface and downhole EM conductive plates between 300 to 380 metres down plunge from the last mineralized section in the resource. Although they hit minor gold-cobalt mineralization the main target is interpreted to be further east and has not been drilled tested. As such Raja remains open in the down plunge direction and further drilling is required (Figure 2).

Mawson’s permit enforcement has gained positive resolution, which allows Mawson to drill from 200 drill platforms (from 529 optional sites) plus 76 existing drill platforms within the 1,462 hectare Kairamaat 2-3 exploration permit area next drill season and likely for 3 years total (including this year’s 15,000 metre drill program). This is considered an extremely positive outcome.

Technical and Environmental Background

The gold equivalent ("AuEq") value used in the resource and this press release was calculated using the following formula: AuEq g/t = Au g/t + (Co ppm/608) with assumed prices of Co $30/lb; and Au $1,250/oz. AuEq varies with gold and cobalt prices. A long-term price point has been chosen for both commodities to maintain consistency of reporting individual drill holes against the resource dated December 2018. Approximate spot prices for gold and cobalt are currently $1280/oz and $16/lb respectively.

Assuming a predominant stratabound control, the true thickness of the mineralized interval is interpreted to be approximately 90% of the sampled thickness. Quality control duplicates for all holes show good repeatability of gold assays. Intersections are reported with a lower-cut of 0.5g/t gold or 304ppm Co over 2 metre lower cut, except where indicated. No upper cut-off was applied.

Four diamond drill rigs (K3 & K8) from the Arctic Drilling Company OY (“ADC”), Kati OY (“Kati”) and MK Core Drilling OY (“MK”), all with water recirculation and drill cuttings collection systems were used for the drill program. Core diameter is NQ2 (50.7 mm). Core recoveries were excellent and average close to 100% in fresh rock. After photographing and logging in Mawson’s Rovaniemi facilities, core intervals averaging 1 metre for mineralized samples and 2 metres for barren samples were cut in half at the Geological Survey of Finland (GTK) core facilities in Rovaniemi, Finland. The remaining half core is retained for verification and reference purposes. Analytical samples were transported by Mawson personnel or commercial transport from site to the CRS Minlab Oy facility in Kempele, Finland. Samples were prepared and analyzed for gold using the PAL1000 technique which involves grinding the sample in steel pots with abrasive media in the presence of cyanide, followed by measuring the gold in solution with flame AAS equipment. Multi-element assays, including cobalt are determined using the ICP-MS method (IMS-230) of MS Analytical shipped directly from the CRS Minlab Oy facility. The QA/QC program of Mawson consists of the systematic insertion of certified standards of known gold content, duplicate samples by quartering the core, and blanks the within interpreted mineralized rock. In addition, CRS and MS Analytical insert blanks and standards into the analytical process.

The qualified person for Mawson's Finnish projects, Dr. Nick Cook, President for Mawson and a Fellow of the Australasian Institute of Mining Metallurgy has reviewed and verified the contents of this release.

NI 43-101 Technical Report:

On December 19, 2018, Mawson filed an independent National Instrument 43-101 Technical Report (the “NI 43-101 Technical Report”) on the Mineral Resource Estimate for the Raja and Palokas Prospects, at the 100% owned Rajapalot Project in Finland, (the “NI 43-101 Technical Report”), in support of the Company’s news release dated December 17, 2018. The NI 43-101 Technical Report was authorized by Mr. Rod Webster of AMC Consultants Pty Ltd (“AMC”) of Melbourne, Australia, and Dr. Kurt Simon Forrester of Arn Perspective of Surrey, England. Each of Mr. Webster and Dr. Forrester are independent “qualified persons” as defined by National Instrument 43-101. The NI 43-101 Technical Report may be found on the Company’s website at www.mawsonresources.com or under the Company’s profile on SEDAR at www.sedar.com.

About Mawson Resources Limited (TSX:MAW, FRANKFURT:MXR, PINKSHEETS:MWSNF)

Mawson Resources Limited is a sustainable and ethical exploration and development company. Mawson has distinguished itself as a leading Nordic Arctic exploration company with a focus on the flagship Rajapalot gold-cobalt project in Finland.

On behalf of the Board,

"Michael Hudson"
Michael Hudson, Chairman & CEO
Further Information
www.mawsonresources.com
1305 – 1090 West Georgia St., Vancouver, BC, V6E 3V7
Mariana Bermudez (Canada), Corporate Secretary,
+1 (604) 685 9316, info@mawsonresources.com

Forward-Looking Statement

This news release contains forward-looking statements or forward-looking information within the meaning of applicable securities laws (collectively, "forward-looking statements"). All statements herein, other than statements of historical fact, are forward-looking statements. Although Mawson believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate, and similar expressions, or are those, which, by their nature, refer to future events. Mawson cautions investors that any forward-looking statements are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements as a result of various factors, including, but not limited to, capital and other costs varying significantly from estimates, changes in world metal markets, changes in equity markets, planned drill programs and results varying from expectations, delays in obtaining results, equipment failure, unexpected geological conditions, local community relations, dealings with non-governmental organizations, delays in operations due to permit grants, environmental and safety risks, and other risks and uncertainties disclosed under the heading "Risk Factors" in Mawson's most recent Annual Information Form filed on www.sedar.com. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, Mawson disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

Figure 1: Plan of Rajapalot showing historic drilling, outline of 43-101 resource, new drill holes reported, modelled ground TEM plates over a background of 25 and 50 metre spaced ground magnetics

Figure 2: Long section at Raja prospect showing continuation of mineralized sequence below existing resource. Outlines of existing resource are also indicated. Note newly reported results in text boxes with bold and red outlines. Some of the more significant intersections from the last 3 years are also included.

Table 1: Collar Information from 2019 Winter drilling at the Rajapalot Project (Finnish Grid, Projection KKJ3)

HoleIDEastNorthAzimuthDipRLDepthProspectComment
PAL01593408545.87372603.556-71179.162473.8RajaAu results Mar 04 2019
Co results here
PAL01603408485.87372581.167-79177.865447RajaAu and Co results here
PAL01613408696.17372556.657-75179.24405.8RajaAu results Mar 04 2019
Co results here
PAL01623408446.47372648.446-84.5180.158482.9RajaAu results Mar 04 2019
Co results here
PAL01633408487.07372587.965-73.5178.218470.05RajaAu results Mar 04 2019
Co results here
PAL01643408545.47372603.261.1-75.6178.586441.7RajaAu and Co results here
PAL01653408612.77372312.260-79176.25167.9RajaAu results Mar 04 2019
Co results here
PAL01663408897.77372385.3240-83170.452238.6RajaAu and Co results here
PAL01673408486.07372587.096-85178398.6RajaAu results Mar 04 2019
Co results awaited
PAL01683408554.57372806.4233-83173.98745.6RajaAbandoned hole
PAL01693408553.57372806.4233-83173.987545.8RajaAu and Co results here
PAL01703408713.07372255.460-79172.803200.2RajaResults Awaited
PAL01713408603.87372636.058-73179.753497.6RajaAu and Co results here
PAL01723408447.47372648.447-79.5180.158491.9RajaAu and Co results here
PAL01733408255.87373707.9116-56173.48427.9South PalokasAu results Mar 04 2019
Co results awaited
VG
PAL01743408255.87373707.9116-69.5173.488.3South PalokasAbandoned hole
PAL01753408830.57372237.560-74172.071120.1RajaResults Awaited
PAL01763408937.37372300.3240-79.5173.012140.0RajaAu and Co results here
PAL01773408434.07372388.0240-60176.1250.5RumajärviResults Awaited
PAL01783408225.97372340.160-75177.064237.2RumajärviResults Awaited
PAL01793408105.57372350.560-80180.572209.0RumajärviResults Awaited
PAL01803408128.37372706.141-61173.634778.65Terry's HammerResults Awaited
PAL01813407954.67372245.0150-60177.834161.7RumajärviResults Awaited
PAL01823407944.87372476.560-70176.8439.65RumajärviResults Awaited
PAL01833408094.07372422.1160-70178.624170.0RumajärviResults Awaited
PAL01843407754.47372867.6120-50173.07211.8RumajärviResults Awaited
PAL01853407900.47372519.660-68173.064381.1RumajärviResults Awaited
PAL01863407905.27372446.255-75174.386341.85RumajärviResults Awaited
PAL01873408547.07372492.447-63.5176.807474RajaResults Awaited
PAL01883408630.27372440.653-63.5176.974379.4RajaAu and Co results here
PAL01893408768.87372378.848-77173.301245.5RajaAu results here, Cobalt results awaited
VG
PAL01903408576.27372512.863-65177.732427.9RajaResults Awaited
VG
PAL01913408547.07372492.444-58.5176.807492.1RajaResults Awaited
VG
PAL01923408221.87373180.6130-60171.892203.2HutResults Awaited
PAL01933408255.37373706.4104-53173.478427.15South PalokasResults Awaited
PAL01943408312.27373980.074-57173.8497.8PalokasResults Awaited
VG
PAL01953408353.97373580.265-77174.918245.6South PalokasResults Awaited
PAL01963408089.17373031.990.5-60172.308317.4HutResults Awaited
PAL01973408271.47373630.163-66.5173.603466.8South PalokasResults Awaited
PAL01983408414.17373660.3117-70174.417296.2South PalokasResults Awaited
VG
PAL01993408126.67373140.2215-80173.042386.7HutResults Awaited
PAL02003408312.27373979.062-61.8173.8536.8PalokasResults Awaited
PAL02013408545.87372603.557-67.25179.162281.0RajaResults Awaited
PAL0201D13408545.87372603.557-67.25179.162195.0-392.2RajaResults Awaited

Table 2: Better intersections report from the 2019 Winter Drill Program.
Intersections are reported with a lower cut of 0.5g/t gold over 2 metre lower cut except where stated in the text. No upper cut-off was applied.

ProspectHole_idfromtowidthAuEqAuCo
RajaPAL0159419.0437.018.01.40.5547
 including419.0420.21.20.80.2378
 including422.0426.04.02.50.31377
RajaPAL0159434.0437.03.03.42.3672
Rajaincluding429.0432.03.00.90.1488
RajaPAL0159451.0455.54.53.21.9754
RajaPAL0161305.5313.07.51.10.0636
RajaPAL0161336.0338.02.02.72.1362
RajaPAL0161344.0349.05.03.32.3600
RajaPAL0162323.0324.01.01.20.0701
RajaPAL0162452.0453.01.00.90.0562
RajaPAL0163416.6419.42.810.90.06604
RajaPAL0164406.0414.38.31.30.4519
RajaPAL0164418.4419.71.30.90.0546
RajaPAL016655.356.31.00.60.1355
RajaPAL016667.868.81.01.00.0568
RajaPAL016676.677.61.01.10.1596
RajaPAL016679.380.31.01.60.0958
RajaPAL0169522.3524.42.10.70.1368
RajaPAL0171299.0300.11.10.90.0528
RajaPAL0172120.0122.02.00.90.0541
RajaPAL0172329.0332.03.01.00.0573
South PalokasPAL0173232.8233.70.8 0.5 
South PalokasPAL0173264.0281.017.0 3.4 
 including264.0269.05.0 4.9 
 including276.1281.04.9 4.6 
South PalokasPAL0173380.0381.11.1 0.8 
South PalokasPAL0173384.8385.81.0 2.0 
RajaPAL017614.015.61.62.52.458
RajaPAL017620.531.911.41.40.8382
RajaPAL017633.835.71.91.21.0105
RajaPAL017649.052.03.04.03.886
RajaPAL0188298.3329.631.36.04.31030
RajaPAL0188298.3315.617.44.82.91113
RajaPAL0188320.6329.69.011.79.41412
RajaPAL0188337.9338.91.03.13.135
RajaPAL0189165.0165.80.81.11.10
RajaPAL0189182.9186.03.24.54.50
RajaPAL0189194.0195.01.01.11.10
RajaPAL0189202.0205.03.04.54.50
RajaPAL0189210.0211.01.01.61.60
RajaPAL0189213.2214.31.17.27.20
RajaPAL0189220.6221.61.00.50.50

Table 3: Individual assay data from key drill holes reported in this release.

hole_idProspectfrom (m)to (m)width (m)Au g/tCo ppm
PAL0159Raja419.0420.21.20.2378
PAL0159Raja420.2421.00.80.010
PAL0159Raja421.0422.01.00.032
PAL0159Raja422.0423.31.30.01131
PAL0159Raja423.3424.00.80.11799
PAL0159Raja424.0425.01.00.22380
PAL0159Raja425.0426.01.00.7367
PAL0159Raja426.0427.01.00.09
PAL0159Raja427.0428.01.00.011
PAL0159Raja428.0429.01.00.016
PAL0159Raja429.0430.01.00.1478
PAL0159Raja430.0431.01.00.1381
PAL0159Raja431.0432.01.00.1605
PAL0159Raja432.0433.01.00.2249
PAL0159Raja433.0434.01.00.073
PAL0159Raja434.0435.01.00.6564
PAL0159Raja435.0436.01.05.41416
PAL0159Raja436.0437.01.00.936
PAL0161Raja336.0337.01.01.1566
PAL0161Raja337.0338.01.03.0158
PAL0161Raja338.0339.01.00.025
PAL0161Raja339.0341.02.00.05
PAL0161Raja341.0342.01.00.020
PAL0161Raja342.0343.01.00.025
PAL0161Raja343.0344.01.00.0103
PAL0161Raja344.0345.01.00.1378
PAL0161Raja345.0346.01.01.0271
PAL0161Raja346.0347.01.04.4563
PAL0161Raja347.0348.01.02.0809
PAL0161Raja348.0349.01.04.0979
PAL0163Raja416.6417.61.00.03939
PAL0163Raja417.6418.61.00.09769
PAL0163Raja418.6419.40.90.06015
PAL0164Raja406.0407.01.00.5378
PAL0164Raja407.0408.01.00.8766
PAL0164Raja408.0409.01.01.4649
PAL0164Raja409.0410.01.00.1324
PAL0164Raja410.0411.01.00.0451
PAL0164Raja411.0412.01.00.1568
PAL0164Raja412.0412.60.60.1859
PAL0164Raja412.6413.40.90.1157
PAL0164Raja413.4414.30.90.4627
PAL0176Raja14.015.01.01.426
PAL0176Raja15.015.60.64.2115
PAL0176Raja15.616.81.30.02
PAL0176Raja16.817.60.80.079
PAL0176Raja17.618.91.30.454
PAL0176Raja18.920.51.60.059
PAL0176Raja20.521.51.00.8421
PAL0176Raja21.522.30.81.1325
PAL0176Raja22.323.61.30.491
PAL0176Raja23.624.00.40.6177
PAL0176Raja24.025.01.03.1643
PAL0176Raja25.026.01.00.6225
PAL0176Raja26.027.41.40.0152
PAL0176Raja27.428.10.70.0358
PAL0176Raja28.129.00.90.9916
PAL0176Raja29.029.70.70.084
PAL0176Raja29.730.71.00.098
PAL0176Raja30.731.91.31.7940
PAL0176Raja31.933.01.10.161
PAL0176Raja33.033.80.80.4156
PAL0176Raja33.835.01.30.896
PAL0176Raja35.035.70.71.3124
PAL0176Raja47.949.01.10.255
PAL0176Raja49.050.01.010.058
PAL0176Raja50.051.01.00.657
PAL0176Raja51.052.01.00.9144
PAL0188Raja298.3299.31.00.1404
PAL0188Raja299.3300.31.00.1543
PAL0188Raja300.3301.31.02.72079
PAL0188Raja301.3302.31.00.2396
PAL0188Raja302.3303.31.00.2264
PAL0188Raja303.3304.31.00.2260
PAL0188Raja304.3305.31.00.3412
PAL0188Raja305.3305.90.71.2361
PAL0188Raja305.9306.60.70.1105
PAL0188Raja306.6307.71.10.021
PAL0188Raja307.7308.71.02.6669
PAL0188Raja308.7309.61.05.2953
PAL0188Raja309.6310.61.01.92072
PAL0188Raja310.6311.61.00.31526
PAL0188Raja311.6312.61.00.52636
PAL0188Raja312.6313.61.02.32773
PAL0188Raja313.6314.61.018.22414
PAL0188Raja314.6315.61.015.81636
PAL0188Raja315.6316.61.00.050
PAL0188Raja316.6317.00.40.070
PAL0188Raja317.0317.60.60.018
PAL0188Raja317.6318.61.00.115
PAL0188Raja318.6319.61.00.156
PAL0188Raja319.6320.61.00.148
PAL0188Raja320.6321.61.00.3844
PAL0188Raja321.6322.61.03.5936
PAL0188Raja322.6323.61.03.1485
PAL0188Raja323.6324.61.00.4541
PAL0188Raja324.6325.61.03.2852
PAL0188Raja325.6326.61.017.23903
PAL0188Raja326.6327.61.053.33394
PAL0188Raja327.6328.61.02.71377
PAL0188Raja328.6329.61.01.0375